1、 Table of contents 1 AREVA at your service (51.1Our Service Unit: our specialists, and suitably adapted services (52 With regards to this User Manual (62.1Responsibilities (62.2Particular instructions for operations and interventions on energized equipment (62.3Other technical notices to be consulte
2、d (62.4Tools (not supplied required for the operations describ ed in this user manual (62.5Symbols & conventions (63 Functional interlocks (73.1Functional mech anical interlocks (73.2Interlocks for functions C and T1 (73.3Interlocks for function CB (74 Operating accessories (84.1Reminder for Man
3、ual Operations (84.2Operating accessories (84.3Key locks (optional (85 Use of the C function (95.1Opening the earthing switch (95.2Closing the earthing switch (95.3Closing the switch disconnector (105.4Opening the switch disconnector (106 Use of the T1 function (116.1Opening the earthing switch (116
4、.2Closing the earthing switch (116.3Closing the switch disconnector (126.4Opening the switch disconnector (127 Use of the CB function (137.1Opening the earthing switch (137.2Closing the earthing switch (137.3Closing the disconnector (147.4Opening the disconnector (148 Maintenance (158.1Levels of mai
5、ntenance (158.2Preventive maintenance (158.3Corrective maintenance (158.4Replacement of the three fuses (158.4.1Replacement of a fuse (168.5Replacement of a signal lamp assembly (1739 Spare parts (189.1The spare part (189.2Identification of materials (199.3Storage conditions (1910 Cable testing (201
6、0.1Preparation of the function (2010.2Cable testing (2011 At the end of the equipment operational life (2111.1Safety instructions (2111.2Dismantling of the equipment service (2111.3Distribution and recovery of the materials used for Unisarc (2212 Notes (2345 1 AREVA at your serviceOperations and mai
7、ntenance may only be carried out by personnel w ho have re-ceived suit able authoris ation for the opera-tions and manuvres they are responsible for performing.If this is not the c ase, pleas e refer to our Service Unit or Training Centre.All locking out operations must be per-formed according to th
8、e s afety regulations currently being in force.1.1 Our Service Unit: our specialists, and suitably adapted services> Guarantee extension contracts in relation to the selling of new equipment,> Supervision of HVA switchgear installa-tions,> Technical advice, diagnoses of t he f acili-ties, e
9、xpertise,> Maint enance contracts adapt ed to opera-tional constraints,> Systematic or conditional prevent ive maint enance,> Corrective maintenance in case of partial or complete failure, > Supply of spare parts.Contact the AREVA Service Unit for diagnoses and advice: Working hoursPhone
10、 No: +39 0377 417 351 7 office hours Fax: +39 0377 451133KUA3400 2 With regards to this User Manual© AREVA 2008. AREVA, the AR EVA logo and their figurat ive forms are AREVA registered trademarks. The other brand names ment ioned withinthis document, whether they be copyrightor not, belong t o
11、their respective holders.2.1ResponsibilitiesOur devices are quality controlled and tested at t he factory in accordance with the standards and the regulations currently in force.Apparatus efficiency and apparatus lif e depend on the compliance with t he instal-lation, commissioning and operation in-
12、structions described in this user manual. Non respect of these instructions is likely to invalidate any guarant ee.Local requir ements especially about safety and which are in accordance with t he indi-cations given in this document, must beobserved.AREVA declines any responsibility for theconsequen
13、ces:> due to the non r espect of the recom-mendations in t his manual which makereference to t he international regula-tions in force.> due to the non r espect of the instruc-tions by the suppliers of cables andconnection accessories during installa-tion and f itting operations,> of any pos
14、sible aggressive climaticconditions (humidity, pollut ion, etc.acting in the immediate environment ofthe mat erials that are neither suitablyadapt ed nor protected for these ef-fects.This user manual does not list the lock-ingout pr ocedures that must be applied.The intervent ions described are carr
15、ied outon deenergized equipment (in the courseof being installed or locked out (non op-erational.2.2Particular instructions for operations and interven-tions on energized equipmentWhen commissioning and operat ing the equipment under normal condit ions, the General s afety instructions for electrica
16、l applications must be respected, (prot ective gloves, insulating stool, etc., in addit ion t o standard operat ing instructions. All manipulations must be completed oncestarted.The durations (for completing the opera-tions mentioned giv en in the maintenancetables are purely an indication and depen
17、don onsit e conditions.2.3Other technical notices to be consulted> 2.4Tools (not supplied required for the operations de-scribed in this user manual> Flat, t hin screwdriver (4 + medium> Leat her gloves 2.5 Symbols & conventions> Code for a product recommended andmarket ed by AREVACA
18、UTION! Remain vigilant!Precautions to be taken in order to avoid accidents or in-jury> Tight ening torque value.> Example: 1.6 daN.mFORBIDDEN! Do not do it!Compliance w ith this indication is compulsory, non com-pliance with t his stipulat ion may damage the equipment.> Mark corresponding t
19、o a key INFORMATION ADVICEYour att ention is draw n to a specific point or operation.6 3 Functionalinterlocks3.1Functional mechanical interlocksThe UNISARC switchgear is equipped w ith internal mechanical interlocks, called "functional", int ended to avoid any kind ofoperat ing error.It is
20、 necessary to know t hese interlocks inorder to operat e the switchgear correctly.3.2Interlocks for functions C and T1Position Switch disconn ector Earthing switch Access to cables/fuse compartmentClosed Locked open Locked closedSwitch disconnectorOpen Free Dependant on the pos ition of the earthing
21、 switchClosed Locked open Free Earthing switchOpen Free Locked closed Acces to cablescompartmentC typeOpen Locked open Free Acces to cables/fusecompartmentT1 typeOpen Locked open Locked closed 3.3Interlocks for function CBPosition Circuit breaker Disconn ector Earthing switchAccess cover to cable co
22、mpartmentClosed(Interlock keyretainedLocked closed Locked open Locked closed Circuit breakerOpen(Interlock key releas ed Free w ith inter loc k keyactuated (K.I and de-pendant on t he posit ionof t he earthing sw itchDependant on theposition of t he dis-connectorDependant on the po-sition of the ear
23、thingswitchClosed (Interlock key releas ed Free with int erlockkey actuat edLocked open Locked closedDisconnectorOpen(Interlock key retained Locked Open FreeDependant on the po-sition of the earthingswitchClosed Open Locked open Free Earthing switchOpen Free with int erlockkey actuat edFree with int
24、 erlockkey actuat ed (K.ILocked closedAccess panel t o thecable compartmentOpen Open Locked open Locked Clos ed 7 4 Operatingaccessories4.1Reminder for Manual OperationsAll mov ements of the lev er must be frankand complet e.4.2Operating accessories Operating lever Signal lamp Locking ey elets wit h
25、 loc k4.3Key locks (optionalThey are used, in order to pr event anypossible wrong operations during the UN-ISARC switchgear use.C versionA - Open line free keyB - Close line free keyC - Close earth free keyD - Open earth free keyT1 versionE - Close earth free keyF - Open earth free keyKUA3500KUA36KV
26、 KUA37KVKUA4400KUA38KV89 5 Use of the C function5.1 Opening the earthing switch > Act on the interlock, by shift ing it up-wards> Insert the oper ating lev er into t he earthing switch control.> Grasp the lev er with both hands.> Turn the lever cloc kwise, up to reachthe end of stroke. T
27、he mimic diagram indicat or will t urn from the closedearth positionto the open earthposition .> Extract the operating lev er.5.2 Closing the earthing switchBefore closing the earthing switch, ensure there is no voltage across the voltage presence signal lamp. > Act on the interlock, by shift
28、ing it up-wards> Insert the oper ating lev er into t he earthing switch control.> Grasp the lev er with both hands.> Turn the lever counter-clockw ise, upto reach the end of stroke. The mimic diagram indicat or will turn from theopen earth posit ionto the closedearth position .> Extract
29、the operating lev er.KUA02KVKUA01KVKUA0300KUA0300aKUA04KVKUA01aKV105.3 Closing the switch disconnector > Be shure that the eyelets of the me-chanical int erlock are free. Move t he interloc k to downwards position.> Insert the oper ating lev er into t heswitch disconnector.> Turn the lever
30、cloc kwise, up to reach the end of stroke. The mimic diagram indicat or will turn from the open line positionto theclosed line posit ion . > Extract the operating lev er.5.4 Opening the switch disconnector > Insert the oper ating lev er into t he switch disconnector control.> Grasp the lev
31、er with both hands.> Turn the lever counter-clockw ise, up toreach the end of stroke. The mimic diagram indicat or will turn from theclosed line posit ionto the openline posit ion .> Extract the operating lev er.KUA05KVKUA06aKVKUA25KVKUA05aKVKUA06KVKUA06aaKV 6 Use of the T1 function6.1Opening
32、the earthing switch > Act on the interlock, by shift ing it up-wards> Insert the oper ating lev er into t he earthing switch control.> Grasp the lev er with both hands.> Turn the lever cloc kwise, up to reachthe end of stroke. The mimic diagram indicat or will t urn from the closedearth
33、positionto the open earthposition .> Extract the operating lev er.6.2Closing the earthing switch Before closing the earthing switch, ensure there is no voltage across the voltage presence signal lamp. > Act on the interlock, by shift ing it up-wards then is ert the operat ing lever into the ea
34、rthing switch control.> Grasp the lev er with both hands.> Turn the lever counter-clockw ise, upto reach the end of stroke. The mimic diagram indicator will turnfrom the open earth posit ion tothe closed earth posit ion . > Extract the operating lev er.KUA08KVKUA0700KUA09KVKUA09aKVKUA10KVKU
35、A0700a6.3Closing the switch disconnector > Act on the interlock, by shift ing it downwards.> Insert the closing spring loading leverinto the puposed seat.> Grasp the lev er with both hands. > Turn the lever cloc kwise, up to reach the end of stroke. The closing spring loading indicator w
36、ill turn from the un-loaded spring position to theloaded posit ion.> Extract the operating lev er. > Close the switch disconnector by shift-ing upwards the closing / opening momentary lever switch. The mimic diagram indicat or will turn from the open line position to the closedline posit ion.6
37、.4Opening the switch disconnector > Open the switch disconnector by shift-ing downwards the closing / opening momentary lever switch. The mimic diagram indicat or will turn from the closed line posit ion to the openline posit ion.> The closing spring loading indicator will turn from the loaded
38、 spring po-sitionto the unloaded posit ion.> NOTE : The switch disconnector opening can automatically take place f ollowing the action of one or more fuses that burn. In this case it takes place t he automatic closing spring unloading. The relativ e spring indicator will turn from the loaded spri
39、ng position to theunloaded position.KUA1200KUA11KVKUA13KVKUA14KVKUA15KVKUA16KVKUA17KV 7 Use of the CB function7.1Opening the earthing switch > Act on the interlock, by shift ing it upwards.> Insert the oper ating lev er into t he earthing switch control.> Grasp the lev er with both hands.&g
40、t; Turn the lever cloc kwise, up to reach the end of stroke. The mimic diagram indicat or will t urn from the closed earth positionto the open earth pos ition.> Extract the operating lev er.7.2Closing the earthing switch Before closing the earthing switch, ensure there is no voltage across the vo
41、ltage presence signal lamp. > Act on the interlock, by shift ing it up-wards then insert the operating lev er into the earthing switch control.> Grasp the lev er with both hands.> Turn the lever counter-clockw ise, up to reach the end of stroke.> The mimic diagram indicat or will turn fr
42、om the open earth posit ion tothe closed earth posit ion . > Extract the operating lev er.KUA18KVKUA18eKVKUA19KVKUA18aKVKUA18aaKVKUA18bKV7.3Closing the disconnector > Be shure that the eyelets of the me-chanical int erlock are free, otherwise remove the lock.> Move the interlock t o downwar
43、ds posi-tion then insert the operating lev er into the disconnector control slot.> Grasp the lev er with both hands. > Turn the lever cloc kwise, up to reach the end of stroke. The mimic diagram indicat or will t urn from the open line positionto the closed line position.> Extract the opera
44、ting lev er.> NOTE: Now, it is possible to extract the interloc k key from the disconnector gear and to make it available to per-form the circuit breaker closing opera-tion (see VEIVACUUM L ® Instruction Manual Operation and Maint enance.7.4Opening the disconnector > Extract the interlock
45、 key from the Cir-cuit Breaker gear. > NOTE: The key removing is possible in the opening Circuit Braker status only (see VEIVACUUM L ® InstructionManual Operation and Maint enance.> Insert the interlock key in t he proper seat (K.I near the disconnector slot.> Turn the key by rot ating
46、 it clockw ise. > Move the interlock t o downwards posi-tion then insert the operating lev er into the disconnector control slot. > Grasp the lev er with both hands.> Turn the lever counter-clockw ise, up to reach the end of stroke. The mimic diagram indicat or will turn from theclosed line
47、 posit ionto the openline posit ion .> Extract the operating lev er.KUA21KVKUA20KVKUA22KVKUA24KVKUA2300KUA21aKV 8 Maintenance8.1Levels of maintenanceDescription Levels Operations recommended in t he instructions manual "inst allation - oper ation - maint enance", carried out by suitably
48、qualified personnel having r eceived training allowing them to intervene whilst respecting the s afety rules.1 Complex operations, requiring specific expertise and the implementation of s upport equipment in accordance w ithAREVAs procedures. Thes e must be carried out by AREVA or by a s pecialised
49、technician trained by AREVA when st art-ing the procedures, with the appropriate specific equipment.2All preventive and corrective maintenance, all renov ation and reconstruction work is carried out by AREVA. 3 8.2Preventive maintenancePREVENTIVE MAINTENANCE Frequen cy LevelsRecommended operations 6
50、 years 1 2 3 Verification of the presence and condition of accessories (levers, etc. X X X X Visual inspection of the exterior (cleanliness, absence of oxidation, corrosion or electri-cal discharge, etc.X X X X Cleaning of external elements, of the insulators and all t he insulating parts with a cle
51、an,soft and dry cloth.X X X X Verification of the posit ioning of the status indicators (open and closed X X X X Verification of the f unctioning of the mechanic al control mechanism by making severalmanoeuvresX X X X Visual surveillance of the general appearance of connections X X X X 8.3Corrective
52、 maintenanceCORRECTIVE MAINTENANCE LevelsReplacements or modifications See § 1 2 3 Replacement of the three f uses 8.4 X X X Replacement of a s ignal lamp assembly 8.5 X X X 8.4Replacement of the three fusesIntervention Busbar Cables Switch disconn ector Earthing switch Normal de-energized de-e
53、nergized open closedPossible energiz ed de-energized open closed Locking out the Functional Unit Tools requir ed: Parts required:All locking-out operations must be per-formed according to the particular rules for the network concerned. > Leat her gloves> Compartment key> 3 fuses with the sa
54、me reference (verifyvalues in accordance with the trans-former power Before proceeding to c arryout the operations for remov-ing/inst alling t he parts com-posing the UNISARC switch-gear, be sure that the v oltagewas cut out to the primarycircuit and to t he auxiliaryone. See the corresponding chap-
55、ter in the Installation Manualfor the characteristics of thefuses. The T1 function meets theIEC 6224-105 requirements;particularly, when whateverfuse int ervenes the switchdisconnector automaticallyopens. In this situat ion it isnot possible to reclos e it untilthe blown fuse is replaced.For reliabi
56、lity reasons, re-placement of all of t he threefuses is recommended.8.4.1REPLACEM ENT OF A FUSE For an apparent ly singlephase f ault, it is imperat ivethat all 3 fus es be replaced. The body of a fuse c an be-come very hot f ollowing ashort circuit. Take standardprecautions (leather glov esbefore s
57、tarting work. Whenever changing or fittinga fuse, close the compart-ment immediat ely aft erwardsto avoid letting dust and hu-midity enter. > Activation of one or more fuses leadsto three sit uations:-automatically opens the switchdisconnector. The relat ive mimicdiagram indicat or will turn fromthe closed line position to theopen line position .-the fuses mimic diagram indicatorwill turn from the closed line posi-tion to the open line posit ion.> > Moreov er, auto
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年銀行新員工測試題及答案
- 2025年銀行消保崗筆試題及答案
- 吉林省長春市長春汽車經(jīng)濟技術開發(fā)區(qū)2026屆中考押題數(shù)學預測卷含解析
- 2025年專升本教育試題及答案
- 河北省唐山市遷安市2026屆初中英語畢業(yè)考試模擬沖刺卷含答案
- 湖南省長沙市明徳旗艦2026屆中考猜題語文試卷含解析
- 2025年上海財經(jīng)面試題及答案
- 2025年上海方言測試題及答案
- 四川省巴中學市恩陽區(qū)茶壩中學2026屆中考數(shù)學最后沖刺模擬試卷含解析
- 成都十八中學重點中學2026屆中考語文五模試卷含解析
- 重慶市蔡家地塊項目市場研究報告
- 農(nóng)機購買銷售合同(2025版)
- 政法裝備管理辦法
- 2025年高考真題政治(甘肅卷)-2
- 藥品的分類管理課件
- 《藥品經(jīng)營質量管理規(guī)范》培訓考試試題及答案
- 高校物業(yè)管理辦法
- 機械制圖基礎知識課件
- 高三生物秋季開學第一課
- 湖北省黃岡、襄陽市2025屆物理高一下期末聯(lián)考試題含解析
- 關心兒童的健康
評論
0/150
提交評論