




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
PipeDesignandProductionShipPipingSystemsMarinePipingSystemsBilgeSystemBilgeSystemBilgeSystemBasicrequirementistoprovideeffectivedrainagetoalldryspacesandatthesametimepreventwaterfromenteringthespacesthroughthissystem.DischargeofoilywaterfrommachineryspacesistocomplywithMARPOLAnnex1Oilywateristreatedinanoily-waterseparatorbeforebeingallowedtobedischarged.DischargewatermustbemonitoredwithpuritynottoexceedppmsetbyMARPOL.BilgeSystemBilgemaindiameter,dmL=lengthofshipB=BreadthD=DepthBranchbilgemaindiameter,dbl=lengthofcompartment(mm)(mm)BilgeSystemBilgepumpcapacity,QTwobilgepumpsarerequiredSuctionsarearrangedsuchthatwatercanbepumpedoutwhenshipisinclined5°Arrangementmustbesuchthatwatercannotpassfromseaorballastsystemintodryspacesthroughthebilgesystem(m3/h)Oily-waterSeparatorBallastSystemBallastSystemBallastSystemForsafeoperation,atleasttwoballastpumpsaretobeconnectedtoballasttanks.Strippingeductorcanalsobeusedforemptyingthebilgesincargoholdswith2non-returnvalvesbetweenholdandsystemShipsidevalvematerialmustnotofgreycastironandtodirectmechanicalmanualoperateAirandSoundingSystemsPurposes目的tosecureventilationoftanks,cofferdamandtunnelstopreventover-pressurizingandvacuum(airpipes)
確保艙、圍堰、管道通風(fēng),避免形成過壓或真空(空氣管)toascertainthelevelofliquidintanks,cofferdamandtunnels(Soundingpipes)確定艙、圍堰、管道液位(測深管)Ventpipesneedtopreventfloodingofspacesthroughtheirupperends通風(fēng)管頂部末端要有VentpipesneedtosafelypreventflammableliquidsorvapoursduetotheirfirehazardsAirandSoundingSystemsMachinerySpacesHeavyfueloiloverflowtankhasshortself-closingtypesoundingpipeHFOoverflowtankairpipeisledtoopendeckasrequired.LubricatingoilsumptankairpipemayendinsidemachineryspacebutawayfromignitionsourcesAirandSoundingSystemsMachinerySpacesAiroroverflowpipesinternalarearenormallyrequiredtobe1.25timestheareaofrespectivefillingpipesforatank.Velocityintheairpipeisnottoexceed4m/swhenusingonepumpforonetank.AirandSoundingSystemsAirandSoundingSystemsFire-FightingSystemsFire-fightingSystemFire-FightingSystemsThreegroups:FireMainSeawaterasfireextinguishingmediumAtleasttwofirepumpsandarelocatedintwodifferentcompartmentsAninternationalshoreconnectionisprovidedatportandstarboardforexternalwatersupplySystemistestedwithatleaststreamsofwaterdirectedfromonefirepump.Pressurereliefvalveisfittedtomainstoprotectsuddenover-pressure.Fire-FightingSystemsThreegroups:CarbonDioxidesystemDryfireprotectionUsedincompartmentsthathavepotentialforfire:engineroom,emergencygeneratorroom,paintlockerandgalleyhoodSystemisequippedwithaudioandvisualalarmtoalertpersonneltoevacuatePriortoCO2release,ventilationfansandfiredampertobeshut.Fire-FightingSystemsThreegroups:SprinklesystemWetfireprotectionmainlyforaccommodationareaSystemisfilledwithfreshwaterandpressurizedbycompressedairSubsequently,waterissuppliedfromfiremainSprinkleandfiremainsystemsareseparatedbyanalarmcheckvalve.Whenthepressureinthesprinkledropsbelowthefiremainfirepressure,thefiremainpressurewillovercometheinternalpressureofthevalveliftandautomaticallypushopentoaccommodatethefiremain.FuelOilSystemsMainconcernsFirehazardsFlashpointInsulationRemotecontroloffueloilvalvesStoppingofpumpsCollectionofdrainsfromleaksMaterialsFueloilpipesandtheirvalvesandfittingsisrequiredtobeofsteelorotherfire-resistancematerialsFOStorageandTransferFOStorageandTransferFOStorageandTransferImportantconcernsOverflowpipesQuick-closingvalvesDraintowasteoiltanks(spilltrays)Levelgaugewithheat-resistantglassforsoundingRemotecontroloffueloilvalvesInsulationofhotsurfaceswherefueloilleaks(possiblyinasprayform)ispossibleHFOSettlingTankHFOServiceTankQuick-closingValvesFOSupplytoEngineFOSystemFOSupplytoEngineMaincomponentsStorage(bunkers)TransferpumpSettlingtankHeaterPurifierServicetankFilterViscositycontrollerReturnTank(10to15minutesengineoperation)HFODuplexFilterHFOTransferPumpHFOHeaterHFOSeparatorHFOSeparationSystem
DieselFuelSeparationSystem
DieselFuelSeparationSystem
LubricatingOilStorageandTransferLubricatingOilStorageandTransferMaincomponentsFillingfromdecktotanksMainLOstoragetanktodelivertoMEsumptankQuick-closingvalvesoperablefromoutsideERwherevalvesarebelowtopoftanks(notapplicableforsmalltanksbelow0.5m3)AirpipesmayterminateinsideERprovidedtheiropeningsdonotconstituteafirehazardDuplexfilters(orself-cleaning)areusedwithoutinterruptingoperationsLubricatingOilCirculationSystemLubricatingOilServiceTankLubricatingOilPumpLubricatingOilFilter–Self-cleaningLubricatingOilFilter–Self-cleaningLubricatingOilSystem-ThermostaticValveShell-and-TubeLOCoolerLubricatingOilPurifier
LubricatingOilPurifier
SeawaterCoolingSystemSeawaterCoolingSystemArrangementConventionalandCentralcoolingHighandlowseachestsSuctionsarearrangedfromtwoseainletspreferablyontheoppositesidesoftheshipsFilterscanbecleanedwithoutinterruptingthewatersupplyinthesystem.Temperaturecontrolledthree-wayvalvestore-circulatewaterwhenthewateriscoldSeawaterCoolingSystemOverboardDischargeFreshwaterCoolingSystemFreshwaterCoolingSystemFreshwaterCoolingSystemArrangementFreshwaterfromengineisdeliveredtofreshwatergenerator(evaporator)PressureinthesystemisregulatedbyheexpansiontankTemperature-controlledthree-wayvalvestoallowre-circulationHigh-temperaturecircuit(jacketcooler),low-temperaturecircuit(lubricatingoil)FreshwaterGenerator(Evaporator)FreshwaterCooler(Plate-type)JacketWaterPumpFreshwaterHeaderTankCompressedAirSystem
CompressedAirSystem
NormallythreesystemsStartingairServiceairControlairRequiretwomaincompressorstochargetwoairreceiversfromatmosphericwithinonehourCapacityofreceiverssufficienttoproduce:12startsforreversibleengines6startsfornon-reversibleengines3startsforauxiliaryenginesCompressedAirSystem
NoconnectionstoothermachinerybetweenaircompressorsandmainairreceiversEmergencyaircompressorcanbedieseldrivenorpowersuppliedfromemergencygeneratorPressurereductionstationsandfiltersarerequiredtobeduplicatesSafetyreliefvalvesarefittedatreceiversandsetat10%aboveoperatingpressureCompressedairlineisclassesasClassIIduetohighpressure.AirCompressors
AirReceivers
AuxiliaryAirReceiver
EmergencyAirReceiver
ControlAirDryer(Refrigerant-type)
Pressure-reducingStation
DomesticWaterSystemDomesticWaterSystemDomesticWaterSystemFreshwaterismadebyFreshwatergenerator(evaporator)DeliveryofwatertoaccommodationfromhydrophoreunitsisbycompressedairDomesticwaterissterilizedbeforeconsumptionDomesticwaterisheatedandthencirculated(byhot-watercirculatingpumps)DomesticwaterisalsousedbyHFO,
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 鋅合金生產(chǎn)線項目施工方案
- 獨立壓儲空氣儲能項目建筑工程方案
- 高溫合金材料生產(chǎn)線項目建筑工程方案
- 2025食品安全練習(xí)題庫及參考答案
- 2025年核電普工考試題及答案
- 五金行業(yè)質(zhì)量檢驗標(biāo)準(zhǔn)操作手冊
- 電信行業(yè)客戶關(guān)系管理系統(tǒng)需求文檔
- 全國高校專業(yè)代碼查詢與報考參考
- 公路橋梁維護(hù)技術(shù)實施方案
- 大學(xué)英語六級詞匯沖刺訓(xùn)練試卷 2025年
- 風(fēng)電項目運營與維護(hù)管理方案
- 學(xué)習(xí)《水利水電工程生產(chǎn)安全重大事故隱患判定導(dǎo)則-SLT 842》課件
- 2025年秋招:招商銀行筆試真題及答案(可下載)
- 1.3 逐層分類細(xì)化分類結(jié)果【知識精研】二年級上冊數(shù)學(xué)(人教版2024)
- 甘肅省醫(yī)療建設(shè)管理辦法
- 計算機(jī)視覺(CV)工程師崗位面試問題及答案
- 胸痛的護(hù)理教學(xué)課件
- 學(xué)堂在線 積極心理學(xué)(上)厚德載物篇 章節(jié)測試答案
- 2025年輔警招聘考試題庫(+答案解析)
- 橋梁施工培訓(xùn)課件
- 社區(qū)護(hù)士培訓(xùn)課件
評論
0/150
提交評論