




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
FORENSIC
STRUCTURAL
ENGINEERING:INVESTIGATIONS,
CAUSES
&
REFURBISHMENT
OFCRACKINGIN
A
POST-TENSION
SLAB
BRIDGEANAIRENE
LOREA–INGENIERíA
ZERO
S.L.FORENSIC
STRUCTURALENGINEERING:
INVESTIGATIONS,
CAUSES
&REFURBISHMENT
OF
CRACKINGINAPOST-TENSIONSLABBRIDGESCENARIOCURRENT
STAT
E
OF
THE
BRIDGEOPERATING
PROCEDUREHYPOTHETICALCAUSESIDEALISATIONOFTHESTRUCTUREGEOMETRYPOST-TENSIONING
TENDONSREINFORCEMENTSMATERIALSSTAGESMODEL
ISSUESSIMULATION
ANDANALYSISGLOBALRESISTANCESERVICEABILITYLIMITSTATESREFURBISHMENTCONCLUSIONSFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESCENARIO
THEBRIDGEAGETYPOLOGY–12
years–post-tension
concrete
slab
bridgePC-45MPaMAINFEATURES
–curved
in
plan
R=70m–skewed
abutments–structural
concrete
upperspine–h.b
=1.10+0.25+1.05
=
2.40m–L.c=
48.0m–L.a
=37.5m‰
slenderness=L/20‰
apparent
slend.
=L/37FSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESCENARIO
CURRENT
STAT
EOFTHEBRIDGEEXCESIVE
CRACKING
-overpasses
crack
width
limit–bottom
footpath-
abt.2–bottom
deck-
abt.2abt.2footpathdeckFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESCENARIO
CURRENT
STAT
EOFTHEBRIDGE–upperspine
-topface–upperspine
–sideface
abt.2FSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESCENARIO
CURRENT
STAT
EOFTHEBRIDGE–upperspine
-sideface
abt.1FSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOPERATING
PROCEDUREHYPOTHETICAL
CAUSESIDEALISATIONSIMULATIONREFURBISHMENTREPAIRANALYSISFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOPERATING
PROCEDURE-HYPOTHETICAL
CAUSESEARLY
THERMALCRACKcrack
inducer.REINFORCEMENTDIRECTIONnot
orthogonal.CONCRETED
INAUGUSTWITH40
DEGREESdecreaseof
concrete
resistance
(fck
andfct).THESPINEWAS
CONCRETED
INTWO
STAGESconstruction
joint,
partlybonded
usinganepoxyresin.THEFOOTPATH
WAS
EXECUTEDWITH0.50MTHICK
PAVEMENTnot
prescribed
in
the
project.FSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOPERATING
PROCEDURE-IDEALISATION
OF
THESTRUCTURE
-GEOMETRYBIM
MODELFEMMODELFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
-POST-TENSIONING
TENDONSBIM
MODEL32tendons
24strandsFEMMODELFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
-REINFORCEMENTSBIM
MODELFEMMODELEmbebedreinforcementFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
-REINFORCEMENTSFEMMODEL
DETAILSFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
–MATERIALSCONSTITUTIVE
LAWSCONCRETE
‰
TOTA
LSTRAINCRACK
MODEL.
ROTATED.Noinformation
but
the
onesin
theconstruction
project.Mean
values(MC-2010).CompressivebehaviourThorenfeldt
curveTensile
behaviourHordijk
curvef.cm.t00=
63.70MPaFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
–MATERIALSCONSTITUTIVE
LAWSNONLINEARTENSION
SOFTENINGPlain
concreteFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
–MATERIALSCONSTITUTIVE
LAWSSTEEL‰
ISOTROPICPLASTICITY.
STRAINHARDENING.B500S
Reinforcing
SteelY1860SPost-tensioning
SteelReinforcementCarbon
FiberBarCarbon
Fibertendon
CONFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
-STAGES1stSELFWEIGHT
+POST-TENSIONING
FORCES+BEARING
ANCHORAGE2nd3rd4th5th6th7thDEAD
LOADS:
FOOTPATHS
ANDROADWAYFOOTPATHS
DEAD
LOAD
REMOVALSUPPORTOFFOOTPATHS
SLABONABUTMENTSRESTITUTION
OFNEWFOOTPATHS
PAVEMENTUNIFORM
TRAFFIC
LOADGLOBALRESISTANCE-UNIFORM
TRAFFIC
LOADFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
–MODEL
ISSUESREINFORCEMENTLAP
ANDANCHORAGEPerfect
bond
of
reinforcement.Avoid
duplicity
of
laped
bars.Other
possibilityuseof
bond-slip
by
interfaces
butnotpractical
for
many
bars
(3600embebed
reinforcements).FSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEOP-
IDEALISATIONOF
THE
STRUCTURE
–MODEL
ISSUESTRANSVERSEBEAMAT
SUPPORTSLinearelastic
behaviourof
material.Avoid
local
failure
for
the
introduction
oftendon
forces
atanchorages.FSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEGLOBALRESISTANCE
FACTOR
METHOD
MODEL
CODE
20107th
STEPGLOBALRESISTANCE-UNIFORM
TRAFFIC
LOADFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEGLOBAL
STABILITY
-VERTICALDEFORMATION
dz
(m)STAGE
1ST
-8THGLBUNIFORM
TRAFFICLOADROADWAY
–
WITHOUTNEWREINFORCEMENT
5xTRLOADDZ(M)v.s.
STEPS0.00E+00050100150200250300350400-5.00E-02-1.00E-01-1.50E-01-2.00E-01-2.50E-01-3.00E-01-3.50E-01-4.00E-01-4.50E-01-5.00E-01A10-WORFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEVERTICALDEFORMATION
dz
(m)STAGE
1ST
-
8THGLBUNIFORMTRAFFIC
LOADROADWAY
–
WITHOUTNEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCECOMPRESSIVESTRESS
STAGE
1ST
-8THGLBUNIFORM
TRAFFICLOADROADWAY
–
WITHOUTNEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCECOMPRESSIVESTRESS
STAGE
1ST
-8THGLBUNIFORM
TRAFFICLOADROADWAY
–
WITHOUTNEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEPLASTICSTRAIN
STAGE
1ST
-
8THGLBUNIFORMTRAFFIC
LOADROADWAY
–
WITHOUTNEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEPLASTICSTRAIN
STAGE
1ST
-
8THGLBUNIFORMTRAFFIC
LOADFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEGLOBAL
VERTICALDEFORMATION
dz
(m)
STAGE
1ST
-
8THGLBUNIF.
TRAFFIC
LOADEXTERIORFOOTPATH
LOADED
–WITHOUT
NEWREINFORCEMENTDZ(M)v.s.
STEPSEXTPAT
H0.00E+00020406080100120-1.00E-02-2.00E-02-3.00E-02-4.00E-02-5.00E-02-6.00E-02-7.00E-02-8.00E-02-9.00E-02-1.00E-01A10-WORFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEREINFORCEMENTPLASTICSTRAIN
STAGE
1ST
-8THGLBUNIFORMTRAFFIC
LOADEXTERIORFOOTPATH
–
WITHOUTNEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCECRACK
WIDTH
STAGE
1ST
-8THGLBUNIFORM
TRAFFICLOADEXTERIORFOOTPATH
–
WITHOUTNEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEVERTICALDEFORMATION
dz
(m)
STAGE
1ST
-8THGLBUNIFORMTRAFFIC
LOADINNERFOOTPATH
LOADED
–WITHOUT
NEWREINFORCEMENTDZ(M)v.s.
STEPSINNER
PAT
H0.00E+00020406080100120-1.00E-02-2.00E-02-3.00E-02-4.00E-02-5.00E-02-6.00E-02-7.00E-02-8.00E-02A10-WORFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCEREINFORCEMENTSTRESS
STAGE
1ST
-8THGLBUNIFORMTRAFFIC
LOADINNERFOOTPATH
–WITHOUT
NEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
GLOBAL
RESISTANCECRACK
WIDTH
STAGE
1ST
-8THGLBUNIFORM
TRAFFICLOADINNERFOOTPATH
–WITHOUT
NEWREINFORCEMENTFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
SERVICEABILITYWITHOUT
NEWREINFORCEMENT–
BOTTOM–CRACK
PATTERN
-fctmind.kupFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
SERVICEABILITYWITHOUT
NEWREINFORCEMENT–
TOP
–CRACK
PATTERN
-fctmind.kupFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
SERVICEABILITYWITHOUT
NEWREINFORCEMENT–
TOP
–CRACK
PATTERN
-fctmind.kupFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGESIMULATION
ANDANALYSIS
SERVICEABILITYREINFORCEMENTSTRESSESFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEREFURBISHMENT
ANDREPAIR
–PROPOSALCARBON
REINFORCEMENTSFEM
SIMULATIONOTHERANALYTICAL
STUDIESTOP
FACE
–RADIAL
DIRECTIONBOTTOM
DECKFACE
–RADIAL
DIRECTIONVERTICAL
THROUGH
THESPINEBIM
MODELFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEREFURBISHMENT
ANDREPAIR
–PROPOSALCARBON
REINFORCEMENTSFRPFIBER
REINFORCED
POLYMERBARS
/TENDONS
BOUND
INANEPOXI
MATRIXSTAGES1st
SELFWEIGHT
+PTFORCES
+ANCHORAGE2nd
DEADLOADS:FOOTPATHS
ANDROADWAY3rd
FOOTPATHS
DEADLOAD
REMOVAL4thSUPPORT
OFFOOTPATHS
SLABON
ABUTMENTSCARBON
REINFORCEMENTS5th
RESTITUTION
OF
NEW
FOOTPATHS
PAVEMENT6th
UNIFORM
TRAFFIC
LOADFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEREFURBISHMENT
ANDREPAIR
–PROPOSALBIM
MODELFEMMODELFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEREFURBISHMENT
ANDREPAIR
–PROPOSALCARBONREINFORCEMENTSTRESSESFSEINVESTIGATIONS,
CAUSES&REFURBISHMENTOFCRACKINGIN
APOST-TENSIONSLABBRIDGEREFURBISHMENT
ANDREPAIR
–PROPOSALCARBONREINFORCEMENTSTRESSESFSEINVESTIGATIO
溫馨提示
- 1. 本站所有資源如無(wú)特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025第二人民醫(yī)院臨床研究協(xié)調(diào)員藥物臨床試驗(yàn)GCP考核
- 張家口市中醫(yī)院消化內(nèi)科質(zhì)量控制員崗位競(jìng)聘質(zhì)控體系試題
- 2025安徽師范大學(xué)校醫(yī)院專業(yè)技術(shù)人員招聘2人模擬試卷附答案詳解(模擬題)
- 張家口市中醫(yī)院鼻骨骨折復(fù)位術(shù)考核
- 張家口市人民醫(yī)院電子病歷系統(tǒng)應(yīng)用水平分級(jí)評(píng)價(jià)標(biāo)準(zhǔn)試題
- 衡水市中醫(yī)院透析患者用藥指導(dǎo)考核
- 大學(xué)配音課件
- 北京市中醫(yī)院甲狀腺功能解讀與干擾因素分析考核
- 2025廣東廣州市黃埔區(qū)教育局招聘事業(yè)編制教職員206人模擬試卷及答案詳解(奪冠系列)
- 2025年福建省三明城發(fā)綠城物業(yè)服務(wù)有限公司人員招聘3人模擬試卷及答案詳解一套
- 2025年電力系統(tǒng)工程師高級(jí)專業(yè)試題及答案
- 2025年電商平臺(tái)新業(yè)態(tài)發(fā)展趨勢(shì)與運(yùn)營(yíng)策略研究報(bào)告
- 2025中糧集團(tuán)社會(huì)招聘7人筆試歷年參考題庫(kù)附帶答案詳解
- 海南自貿(mào)港考試題及答案
- 2025年初級(jí)藥師資格考試試題(附答案)
- 2025廣東云浮市檢察機(jī)關(guān)招聘勞動(dòng)合同制司法輔助人員17人備考考試題庫(kù)附答案解析
- 人工智能與建筑產(chǎn)業(yè)體系智能化升級(jí)研究報(bào)告
- 工裝夾具設(shè)計(jì)培訓(xùn)課件
- 包覆拉拔法制備銅包鋁、銅包鋼雙金屬導(dǎo)線的多維度探究與展望
- 大氣的受熱過程教學(xué)課件
- 茶葉農(nóng)藥知識(shí)培訓(xùn)課件
評(píng)論
0/150
提交評(píng)論